2015年12月21日星期一

Merry Christmas and Happy New Year

New Year is coming soon, here PK Machinery wishes everyone a happy new year.
New year is approaching, in order to appreciate the trust and support of customers, many shopping malls launch a variety of promotions, for example, super big sale, discounts and other promotions. Of course, not only daily commodities have such promotions, in our PK Machinery also has such activities. Promotional activities are as follows:
1.In accordance with different configurations, we can quote our customers best discount based on the original price as to vibrating screen and conveying equipment.
2.We will provide free site planning and design for customers in need.
In order to thank the support of our customers, Henan Pingyuan Mining Machinery Co., Ltd puts forward a favourable activity, not exaggerate, not cheating. And we just want to give a gift to our customers in the New Year.
Henan Pingyuan Mining Machinery Co., Ltd wish you happy Christmas. 

pk merry christmas

How to solve inflexible rotation problem of conveyor roller?

To ensure accuracy during conveyor roller manufacturing process 
Such as the inner hole precision of punch bearing housing should reach grade 3, dimensional tolerance,coaxial degree and ovality of the pipe body two ends must conform to the national standard,can not exceed the tolerance.
Sealing and lubrication
in addition to ensure the quality of manufacture, also require better lubrication materials, such as lithium base grease which can improve the bearing lubrication performance, this is very necessary to prolong the service life of roller.
Bearing seat adopts labyrinth seal structure of centripetal ball bearing supporting and plastic sealing ring, which can guarantee reasonable bearing stress of roller during operation,but also ensure good dust prevention effect, small resistance, and convenient installation and easy maintenance, it can effectively reduce the conveyor operation cost at the same time. 

solve inflexible rotation problem of conveyor roller

2015年11月25日星期三

Xiaohe Training Courses were Held in PK Machinery

Those days, many companies including PK Machinery have attended training courses which sponsored by Xiaohe Training. Aiming at improving the working ability of staff and promoting the development of foreign trade team even increasing business performance of foreign trade department, we actively participate in this training courses.
This training courses will last one month. Ant it contains many very useful lessons, such as SEO, Google Adwords, Youtube markting and others. Not only the lecturers are very enthusiastic and responsible for the class, but also the learners are very hardworking and attaching importance to this training courses. Every day we have finished our lessons in the daytime, we all review the knowledge what we have learned at night. Devoting so much energy to the courses, we all believe PK Machinerywill achieve great success in the near future. 

pk-training-courses

Operation and Maintenance of YA Circular Vibrating Screen

1.Before starting up circular vibrating screen, please check whether the fastening bolts are loose or not, if there is looseness,please tighten at once.
2.Non-load running for 4 to 6 hours to achieve the requirements of smooth screen body , no yaw and abnormal sound , the vibrator bearing temperature is less than or equal to 75℃.
3.After non-load running, please tighten the screw bolt again.
4.Once the operation becomes normal, check the fixture condition of the fastening bolts regularly.
5.Check the wearing parts frequently, the damping spring which is damaged spring or without elasticity,please replace timely. If the screen occurs fracture or wear, please tighten or replace the spring at once. The adjustment,use and maintenance of vibration source, please refer to vibration source instructions. (please oil the vibration motor after using for 3 months, oil the exciter every month, repair every half year, overhaul every year).
6.Stop feeding the material before stopping running the machine, stop the machine after the material on screen surface are completely discharged. 

circular-vibrating-screen

2015年8月20日星期四

Vibratory Feeder and Portable Belt Conveyor Have Been Delivered

On August 19th, 2015, trommel screenbelt conveyorsvibratory feeder, hopper and gate valve ordered by Kazakhstan client and DY5012 portable belt conveyor ordered by Philippines client have been delivered from our company.
drum screen conveyors system
 
On August 26th, 2015, machines oredred by Kazakhstan client will be delivered to Astana, Kazakhstan from port of Xi’an by railway. And as a production line, trommel screen, belt conveyors, vibratory feeder and hopper are mainly used to screen and convey sand.
conveyor rollers delivery
 
On August 23th, 2015, DY5012 portable belt conveyor ordered by Philippines client will be delivered to Cebu from Qindao port. Our customer has ordered two portable belt conveyors, two spare belts and some spare rollers. And this belt conveyor is used to convey packed bag that weighs 50kg. Due to move easily, it can improve conveying efficiency better. At the same time, our client speaks highly of our service.
PK Machinery is devoted to provide better products and service to our customer. So welcome to your enquiry! 

bagged bulk materials of portable belt conveyor

2015年8月15日星期六

Troubleshooting for Gyratory Screen

As one of our main product, gyratory screen has been supplied to many plants all over the world and also enjoys a good reputation because of its superior design and quality. Gyratory screen is widely applicable to chemical, food processing, refractory materials, building materials, activated carbon, food, PVC powder and other fine materials.
However, during the operation, we may meet some problems, here PK Machinery will introduce the breakdown reason and method in detail.
 
gyratory screeners

 
 
BreakdownReasonSolution
V-belt heating upV-belt looseness
Through of belt is broken or the surface is rough
Loose the bolt which fastens the motor, adjust the distance between motor and belt pulley
Check and repair the belt pulley
Bearing heating upThe grease is excessive or shortage or the quality is bad
Bearing is broken
Main shaft bends or the inertial force is not balanced
The bearing cup is not compatible with other parts
Belt is too tight
Overload working for a long time
Change the grease
Change bearing
Correct the main shaft
Change the part which coordinate with the bearing
Adjust the tightness of the V-belt
Reduce the feeding rate
There is no force for motor
Two phase electricity
Circle short for the winding
Overload working for a long time
Power on the lost phase electricity to ensure it runs under 3 phases
Inspect the motor
Keep the screen working under the rated load
Fail to start the motorLow voltage
Electrical wiring is too thin
Fuse is broken
Start the screen once electricity is normal
Change the electrical wiring
Change a proper fuse
Violent or wiggly vibrationThe rotation shaft bends
Bearing is broken
Replace or correct the shaft
Replace the bearing
The unqualified size material mixed in the finished materialScreen mesh is broken
Screen cover or seal bar is loose
Renew the screen mesh
Press the cover and seal bar
Capacity decliningThe moisture is too high, block the mesh
The opening size is not suitable
Rotation speed is low or the V-belt is loose
Feeding rate is low
The rubber ball is worn out
Reduce the moisture of material
Renew the screen mesh
Check the belt pulley and the tightness of belt
Increase the feeding rate
Renew the feeding rate

2015年8月13日星期四

Test Running Note of Scraper Conveyors (I)

PK Machinery offers horizontal scraper conveyors and inclined scraper conveyors, the angle can range from 0 degree to 90 degrees. Scraper conveyors are widely used for transporting cement , coal, metallurgy, mining, construction material, chemical, grain etc. There are two stages of test running : no-load and load test running. Here PK Machinery will introduce it in details:
conveyor scraper


Non-load test running

1.Check if there is any remaining tool, iron casting pieces and other hard objects inside the scraper conveyor, if any , please clear up. 

2.Give enough lubrication to all the bearings, driving devices and drive chain etc. 

3.Check if all the scraper conveyor parts are intact, whether the tense of scrapers is suitable or not. 

4.After finish checking the above items, then power on and switch off several times to see if the operation is normal, if normal, run the scraper conveyor continuously.

5. In addition, the head, tail , medium parts and other main structures, workers must be sent to observe the running , if any problems, please solve it without delay.